The CPA’s Economic and Construction Update provides an insightful summary of the latest economic and construction trends in the UK.

The latest weekly update is enclosed, including:

  • RIBA Future Trends Survey (October 2026)
  • MHCLG Net Additional Dwellings in England (2025/26)
  • Crest Nicholson Trading and Balance Sheet Update (November 2026)

The CPA’s Autumn forecasts were published on 26 October and FIS members have exclusive access to this via our membership of CPA.

The update is an excellent resource for anyone interested in the UK construction industry, and the contents page allows readers to easily navigate to the sections that are most relevant to their interests.

    See more news likes this

    CPA Economic and Construction Update

    CPA Economic and Construction Update

    The CPA's Economic and Construction Update provides an insightful summary of the latest economic and construction trends in the UK. The latest weekly update is enclosed, including: RIBA Future Trends Survey (October 2026) MHCLG Net Additional Dwellings in England...

    And the winners of the 2026 Training Awards are…

    And the winners of the 2026 Training Awards are…

    FIS and Worshipful Company of Plaisterers have announced the winners of the sector Training Awards at its lunch held at Plaisterers’ Hall in London today. In front of a packed audience at Plaisterers’ Hall, the winners of the 2026 Training Awards were announced and...

    Christmas is on its way. Is your cash?

    Christmas is on its way. Is your cash?

    We are about five weeks away from the break the industry takes at Christmas and New Year and in this piece, I want to focus on the importance of dealing with payment and cash flow issues, before everybody disappears on holiday. This time last year I experienced some...

    And the winners of the 2026 Training Awards are…

    And the winners of the 2026 Training Awards are…

    FIS and Worshipful Company of Plaisterers have announced the winners of the sector Training Awards at its lunch held at Plaisterers’ Hall in London today.

    In front of a packed audience at Plaisterers’ Hall, the winners of the 2026 Training Awards were announced and presented by Guest Speaker Jimmy Gittins.

    The Awards are a collaboration between FIS and The Worshipful Company of Plaisterers to recognise outstanding apprentices and students, and individuals and organisations that have made a lasting contribution to training and development in plastering and interior trades. Also recognised were those delivering exceptional training for our sector along with a Lifetime contribution to skills and training development award.

    Commenting on the awards, FIS Past President Ian Strangward said:

    “Congratulations to all the learners and apprentices being recognised. You’ve chosen an industry full of opportunity, and your hard work, commitment and achievements are a real credit to you. You should be proud of how far you’ve come and excited about what the future holds.

    “I’d also like to recognise the mentors, trainers and assessors who play such an important role in developing the next generation of talent. Their expertise, encouragement and commitment are helping to build the skills our industry needs to thrive. The difference they make to individuals, their careers and the wider industry should never be underestimated.”

    The 2026 award winners are:

    Apprentice of the Year – Interior Systems
    WINNER: Harrison Priestley of DSP (Interiors)

    Runners up: Garry Thompson and Jack Crewe both of Measom Dryline

    Apprentice of the Year – Plastering
    WINNER: Nathaniel Amoussou staudying at Doncaster College

    Runners up: Ruby Hillary of Coleg Llandrillo and Bradley Richards of Craven College

    Professional Apprentice of the Year
    WINNER: Jack Uttridge of Measom Dryline

    Student of the Year – Plastering
    WINNER: Ivanna Clary of Craven College

    Runners up: Adrian Aulich of Coleg Sir Gar and Corrien Cantrell of Barnsley College

    Colleges and Independent Training Providers (large)
    Winner – NPTC Group of Colleges
    Runner up – Coleg Llandrillo

    Colleges and Independent Training Providers (small)
    Winner – Errigal Contracts
    Runner up – The Skills Centre

    Formula Trophy
    WINNER: Redcar and Cleveland College

    FIS Member Training Programme
    WINNER: Measom Dryline for its Level 2 Interior Systems Installer Apprenticeship & Level 3 Advanced Drylining Apprenticeship Pilot

    Training Champion
    WINNER: Ben Kerslake of carringtonLIME Heritage Skills Training C.I.C

    Lifetime Contribution to Training Award
    WINNER: Colin McCaughey of Errigal Contracts

    Congratulations to all the winners and nominees for their hard work and dedication in pursuing their academic goals!

    Our thanks go to our awards and event sponsors British Gypsum, the Build Better Academy, Saint-Gobain Formula, The Plaisterers Charity and CITB.

    Christmas is on its way. Is your cash?

    Christmas is on its way. Is your cash?

    We are about five weeks away from the break the industry takes at Christmas and New Year and in this piece, I want to focus on the importance of dealing with payment and cash flow issues, before everybody disappears on holiday.

    This time last year I experienced some very difficult issues, and as an example receiving a communication from a construction organisation to say that they were shutting down from 23 December until early January, and no one would be responding to emails or phone calls or text messages, and the business would resume when everybody was back at work.

    That left a number of clients who were seeking payment and anticipating that payment would arrive and when it didn’t, they had no way of communicating with organisations who owed them money. That is only one example of some of the issues that FIS members experienced.

    So, what I have decided to do is to set out some guidance, given in good faith, to use the next few weeks to chase down monies that your owed and to take some robust action if payments are not coming through.

    Start chasing retentions

    One absolute priority, in my opinion, is to start chasing your retentions and I really find it incredible that so many construction organisations have significant amounts of money outstanding and these are not being pursued. Moving forward, I think it is essential that contractors maintain a log recording when retentions are due at practical completion, and at the end of the defects liability period, and to keep pressure on to recover these.

    If retentions are due, then you can make an application for payment, and if no payment notice or pay less notice is received, then the amounts, applied for, will become due. Alternatively, if you are not making progress with whoever is holding the retention, and refuses to engage, then you can crystallise the dispute and commence adjudication under the Low Value Schemes or the Summary Procedure, where the fees of the adjudicator are fixed. Either way it’s your money, and it should not be in someone else’s pocket.

    Applications for payment

    I have mentioned before the importance of making sure that your applications for payment are fully detailed and substantiated and do not give, either the client or the main contractor, any opportunity to put a red pen through your figures. It is also essential that when you submit your application that you try to follow that up with a discussion with the clients quantity surveyor and to arrange to meet them to go through your application, and if further and better particulars are required, then provide these.

    You will need to adopt the same process with your own subcontractors whose works will be included in your application for payment. In my opinion, not substantiating applications for payment is one of the main reasons why contractors are not getting paid for what they think they are due, and we are working with a number of FIS members to review their applications for payment every month, to see they are up to scratch.

    I am often asked what happens if a member is making no progress with the client/design team involved. Any issues should be promptly elevated to senior management within the other organisations involved, and if necessary, even the client. Email communications are the bane of the construction industry, but these are not likely to go away, but I do encourage our clients to encourage, face-to-face engagement with the people you are working with, rather than having to deal with people that send out emails giving the other side bad news about an application for payment.

    In relation to my opening comments, about the nonavailability of personnel, my suggestion is to engage with the organisations who you are dealing with right now and find out what their plans are as regards closing their offices and getting some assurances that your payment issues will be dealt with before the doors are locked. I suggest you shouldn’t sail along in the hope that everything will be all right on the night, and just do all you can to ensure that you are going to be paid on time.

    I mentioned in previous articles, the importance of having payment schedules in your contracts and they set out the contractual date for applications for payment, for the issuing of payment notices and pay less notices and the final date for payment. What you need to do is to make sure you  stick rigidly to these agreed dates because if you don’t, and an application for payment is late, and will go into the next payment cycle, then this will have a significant impact on your cash flow.

    For the avoidance of doubt, I am not suggesting in any way that members need to adopt a confrontational approach and in fact it’s the very reverse and engaging and discussing and finding out if there is a problem and providing any further information that is required and making sure the payment lands in your bank on the final date for payment.

    Regrettably, in the past few weeks I have experienced an increasing number of organisations who talk to us about contractual issues and payment and cash flow issues despite all the talk in the industry about more collaboration etc., we are still a long way away from resolving many of the industry’s problems.

    Before finishing I want to stress again the importance of members signing the Conflict Avoidance Pledge. This is an early intervention process that can be used to avoid issues and projects escalating into costly and time-consuming construction disputes. I have to say that FIS have fully supported the Conflict Avoidance Coalition, and now have a significant number of members who have signed the Conflict Avoidance Pledge so I would encourage you to do that at conflictavoidance.org

    Hopefully these suggestions I have made in this article will allow you to make progress and to manage the payment process much more efficiently, so in closing I would like to thank the support I’ve had from FIS and I look forward to working with everyone at FIS in 2027.

    len@buntonconsulting.co.uk

    07769 670089

    MHCLG publishes response to Construction Products Reform White Paper and General Safety Requirement

    MHCLG publishes response to Construction Products Reform White Paper and General Safety Requirement

    MHCLG have published their response to the Construction Products Reform White Paper and to the Consultation on the General Safety Requirement for Construction Products.

    The Grenfell Tower tragedy on 14 June 2017, which took 72 lives, exposed profound failures across the built environment, including in the construction products sector. This government is committed to reforming the built environment to ensure that a tragedy like Grenfell can never happen again, with construction products reform being a critical pillar of this system-wide change.

    In February 2026, MHCLG published the Construction Products Reform White Paper, which confirmed proposals for ambitious system wide reform that will help to build renewed confidence and trust in the construction products sector for residents and communities. To drive the pace of reform, we consulted in parallel on a General Safety Requirement (GSR), to bring currently unregulated products into the regulatory regime.

    Through extensive consultation and engagement, there has been strong support for reform from across the construction products sector and agreement that the current system must change. Today’s publications confirms MHCLG’s commitment to reforming the construction products regulatory regime. The responses set out a clear route forward for manufacturers and the wider sector, supporting implementation of the Grenfell Tower Inquiry recommendations and providing certainty to the sector.  Reform will be taken forward to improve safety, strengthen accountability and support innovation and growth. 

    The responses confirm that:

    • General Safety Requirement (GSR) will be introduced for currently unregulated products. The GSR will take a proportionate, risk-based approach that supports safety without placing unnecessary burdens on business or holding back growth and innovation. Manufacturers and other economic operators will be responsible for ensuring that products are safe when placed on the market.
    • MHCLG will seek consistency with the European Union Construction Products Regulation (CPR) where this meets its objectives, by introducing a new framework to replace the current CPR in Great Britain. This will apply to products with a designated standard or subject to a technical assessment. Together, the GSR and CPR will ensure all products are safe when placed on the market, provide regulatory clarity for all actors involved in the supply of construction products, and support trade by minimising friction with trading partners.
    • It is recognised that product safety depends not only on the product itself, but on how it is used in a building. Therefore, additional assurance will be applied depending on product use, and review Building Regulation 7(1), to strengthen the assurance around the safe selection and installation of products.
    • Reforms set out in the white paper will be progressed to strengthen regulatory oversight and clarify responsibilities across the product lifecycle. This includes introducing a mandatory licensing regime for UK Conformity Assessment Bodies (CABs).

    Towards implementation

    A phased and proportionate approach will be taken to implementation, supporting industry readiness, regulatory capacity and stability of the supply chain. MHCLG will seek to legislate as soon as Parliamentary time allows and intend to deliver measures on the rules for placing products on the market through secondary legislation from 2027. This includes the general safety requirement, the new GB CPR and legislation to provide market surveillance powers in Northern Ireland under the EU-CPR 2024.

    Build your workforce’s skills with FIS support

    Build your workforce’s skills with FIS support

    FIS is offering support to members to identify their workforce development needs and explore opportunities for training and progression for individuals to gain recognised NVQs and industry qualifications in fit-out, drylining and plastering.

    By working with the FIS Skills Team to complete a Training Needs Analysis, we can help you to assess your workforce’s existing capabilities and identify appropriate training pathways to help you upskill your team, develop specialist skills and support individuals to progress.

    This support is available through the CITB Specialist Upskilling Project, which aims to remove barriers to training and improve access to sector-specific qualifications, helping businesses address critical skills gaps across specialist construction trades.

    Whether you want to upskill your existing team or develop specialist expertise, a Training Needs Analysis with FIS can help you identify your next steps towards a more competent workforce for the future.

    Find out more

    FIS members interested in accessing support can contact the FIS Skills Team to arrange a Training Needs Analysis and discuss available opportunities. Contact: beenanana@thefis.org or marieflinter@thefis.org

    Milburn Review echoes FIS calls for better routes into construction

    Milburn Review echoes FIS calls for better routes into construction

    The publication of the Milburn Review into young people not in education, employment or training (NEET) has renewed focus on the need to improve vocational pathways, expand apprenticeship opportunities and strengthen the links between education and employers.

    Published on 17 November 2026, the review sets out a series of recommendations aimed at tackling youth unemployment and reducing the number of young people disconnected from education and the workplace. Its longer-term ambition is to reduce the NEET rate to around 5% by 2036.

    Among its recommendations are a new Youth Opportunity Guarantee for 18–24-year-olds, increased investment in apprenticeships and further education, improved access to work experience and greater financial incentives for employers to recruit young people. The review also proposes work placements of up to 12 weeks and new pre-apprenticeship routes to help young people gain experience and progress into employment.

    Creating better routes into construction

    For the construction industry, the recommendations highlight the importance of making vocational careers more accessible and ensuring young people have opportunities to gain practical experience.

    FIS has previously raised many of these challenges in its response to the Government’s consultation on youth participation, identifying declining entry-level apprenticeship numbers, limited capacity among SMEs and weak links between schools and industry as significant barriers to bringing young people into construction.

    In its response, FIS called for greater investment in Level 2 and Level 3 apprenticeships, improved financial and practical support for smaller employers and more employer-led training that reflects the skills and roles needed across the construction supply chain.

    These issues are particularly important for the finishes and interiors sector, which relies on a wide range of specialist trades and skills. Developing competent workers in areas such as drylining, plastering, ceiling installation and interior systems requires practical training, workplace experience and investment from employers.

    Supporting employers is key to tackling skills shortages

    While encouraging more young people to consider construction careers is important, businesses must also have the capacity and confidence to offer meaningful training and employment opportunities.

    For many smaller specialist contractors, taking on an apprentice involves significant financial and operational commitments, including wages, supervision and the time needed to develop new entrants. Without appropriate support, there is a risk that businesses will struggle to provide the opportunities needed to turn young people’s interest in construction into sustainable careers.

    FIS believes that closer collaboration between government, education providers and employers is essential to addressing these challenges. Improving access to apprenticeships, supporting SMEs and creating clearer pathways from education into specialist trades must form part of a longer-term approach to workforce development.

    The Milburn Review provides an opportunity to consider how its recommendations can translate into practical improvements for employers and young people across the construction supply chain.

    Ultimately, tackling youth unemployment and addressing the industry’s skills shortages are closely connected. Supporting young people into work must go hand in hand with investing in the businesses that train, employ and develop the next generation of skilled tradespeople.

    You can read FIS’s response to the Government consultation here: FIS responds to Government consultation on NEET youth report.

    FIS members invited to support new plastering and drylining talent

    FIS members invited to support new plastering and drylining talent

    FIS is encouraging members to consider offering employment and training opportunities to learners taking part in a new construction skills programme delivered by Aronex College, in conjunction with the Greater London Authority (GLA).

    The 14-week programme is designed to equip learners with the practical skills and knowledge needed to begin a career in the construction industry, with a particular focus on Plastering and Interior Systems.

    Successful learners will work towards the NOCN Level 2 Certificate for Plaster Skimmer and gain the qualifications required to obtain a CSCS Green Card.

    The programme covers a range of essential industry skills, including construction health and safety, practical plaster skimming, basic installation of drywall systems and an introduction to self employment in construction.

    Training combines practical workshop sessions with classroom-based learning, where learners develop a portfolio of evidence demonstrating their knowledge and skills. The current cohort consists of 14 learners.

    As the programme progresses, Aronex College is keen to help suitable learners take the next step into sustained employment within the construction and interiors sector.

    FIS is therefore inviting members to consider how they could support the initiative by offering:

    • Apprenticeships in Plastering or Interior Systems Installer (drylining).
    • Work placements or work trials.
    • Opportunities to join in-house contractor training programmes.

    Supporting the next generation

    The programme offers FIS members an opportunity to connect with individuals developing practical construction skills and looking to build careers in the finishes and interiors sector. With demand for skilled tradespeople continuing to challenge the industry, closer links between training providers and specialist employers are essential to creating clear pathways into employment.

    If you are interested, contact beenanana@thefis.org and we will be able to provide further information about the programme and learners’ progress can be provided, alongside opportunities to visit the training workshop or connect directly with Aronex College.

    Unlock the potential of apprenticeships

    Unlock the potential of apprenticeships

    On 3 December, Amazing Apprenticeships will be hosting a webinar for businesses looking to explore the benefits of taking on an apprentice and learn more about how apprenticeships can support their organisation.

    The session will cover:

    • How apprenticeships can help tackle current and future skills gaps.
    • The key benefits apprenticeships can offer your organisation.
    • How to attract, recruit and successfully support apprentices.
    • Where to access practical advice, useful resources and ongoing support.

    Event details

    Whether you’re new to apprenticeships or looking to make more of your existing programme, this webinar will provide valuable insights, practical guidance and ideas to help you make apprenticeships work for your organisation.

    FIS urges industry to “look closer” at reaction to fire classification for wall and ceiling linings

    FIS urges industry to “look closer” at reaction to fire classification for wall and ceiling linings

    New technical note highlights the need for greater scrutiny of fire performance claims across the design and specification process

    FIS is calling on designers, specifiers and manufacturers to take a closer look at the reaction to fire performance of wall and ceiling products (internal linings), following the publication of a new technical note.

    The technical note titled Reaction to Fire, Wall and Ceiling Linings provides practical guidance on an area of fire performance that FIS says is often overlooked or misunderstood, particularly where procurement approaches assume that products are exempt from requirements or where classification claims are not examined in sufficient detail.

    The technical note considers the requirements for internal linings under Approved Document B in England and Wales, including their application to suspended ceilings, wall linings, acoustic systems and office pods. It also provides an overview of BS EN 13501-1 classifications and relevant test methods, helping industry professionals better understand what classifications mean and how they should be considered when selecting and specifying products.

    Reaction to fire is a key performance characteristic for many internal lining products, but it can receive less attention than other aspects of specification. FIS is encouraging the industry to challenge assumptions and place greater emphasis on understanding the evidence behind fire classification claims.

    The publication is particularly relevant to specifiers, designers and manufacturers, providing access to the standards and information needed to support more informed decisions throughout the supply chain. 

    FIS is making the publication available as part of its ongoing work to improve technical knowledge and support better practice across the finishes and interiors sector.

    The guidance was produced with the support of the FIS Partitions, Pods and Doors Working Group and the Ceilings and Absorbers Working Group who lent their expertise and jointly identified some of the issues discussed in the guidance.

    FIS members can download the technical note, Reaction to Fire, Wall and Ceiling Linings, from the FIS Knowledge Hub.