Continuing Professional Development (CPD)
Ceilings
SAS’s RIBA CPD looks at ‘Specifying Performance Demountable Suspended Ceiling Systems’.
RIBA Approved
Delivered: Nationally
Safe, Practical & Aesthetic Roof, Ceiling, Wall and Floor Access Solutions
The CPD looks at managing access, fire, safety and security requirements in your building, from smoke vents, roof access hatches and ladders to fire rated riser doors, wall and ceiling access panels and floor access covers.
Safe Roof Access and Smoke Ventilation for Flat Roofs
The CPD looks at current practice in the provision of smoke ventilation and roof access, discussing designs and applications as a result of the latest Building Regulations, with particular reference to the areas of fire, safety and security.
Drylining
Fermacell’s CPD presentations covering dryling application in education and commercial buildings are presented by its Specification Managers across the UK. As members of the RIBA CPD Providers Network, all of its courses are RIBA approved.
RIBA Approved
Delivered: Nationally
Fire & Smoke – Access Solutions
This session primarily focusses on specifying fire resistant wall and ceiling access to ensure legal compliance. It also looks at building and fire regulations, the correct standards for testing, bi-directional fire testing and aesthetic and acoustic options available.
Movable Walls
‘Multi-functional space’ focuses on the creation of flexible space including design, structure, acoustic performance, finishes, health & safety and maintenance, whilst ‘Vertically Rising Acoustic Partition Systems’ discusses rising acoustic moveable walls, housed in the ceiling cavity.
Partitions
Inline with the WELL Standards V2, this seminar ‘Dividing Spaces for Individual Wellbeing and High-Performance Buildings’ explores the relationship between office design and individual’s wellbeing as well as how employee productivity and satisfaction are intrinsically linked to acoustic control.