The FIS Scottish Awards are a celebration of the exceptional work and diverse range of projects carried out in Scotland. On 18 September, the awards ceremony was held at the impressive voco Grand Central Glasgow. The event, which was hosted by former Scotland and Hibernian goalkeeper Alan Rough and Beverley Lyons, was well-attended, with guests eagerly anticipating the announcement of this year’s winners.

The ceremony began with a short speech from FIS Chief Executive Iain McIlwee followed by a welcome address from FIS President Ian Strangward who highlighted the organisation’s activities in 2026 and plans for the future.

After a fantastic three-course lunch, the presentation of the awards began. The winners were as follows:

Interior Fit-Out

Ceilings

Partitioning

Acoustic Excellence

Most Sustainable Project

    Project of the Year

    The Lifetime Achievement Award was given to Douglas Kerr, former Joint Managing Director at Scotwood Interiors.

    Congratulations to all our winners, and to everyone who entered. 

    FIS Awards Brochure

    You can read all about the winning projects and individuals here.

    See more news likes this

    Incorrect cutting of resilient layer prior to installing drylining

    Incorrect cutting of resilient layer prior to installing drylining

    We have been advised by Robust Details that there have been instances where the resilient layer used to reduce structural sound transference between residences on different floors is being cut before the installation of the drylining. This is having a significant...

    Flooding and Resilience Workshop

    Flooding and Resilience Workshop

    CPA is developing a workshop on Flooding and Resilience which will be held on 3 August. They are looking for expressions of interest from manufacturers or contractors who have any experience of working on a flood resilience building project or have developed any...

    See more news likes this

    Incorrect cutting of resilient layer prior to installing drylining

    Incorrect cutting of resilient layer prior to installing drylining

    We have been advised by Robust Details that there have been instances where the resilient layer used to reduce structural sound transference between residences on different floors is being cut before the installation of the drylining. This is having a significant...

    Flooding and Resilience Workshop

    Flooding and Resilience Workshop

    CPA is developing a workshop on Flooding and Resilience which will be held on 3 August. They are looking for expressions of interest from manufacturers or contractors who have any experience of working on a flood resilience building project or have developed any...