Winchester College
The Project
Supply and installation of semi electric MG100 movable wall system. Acoustic rating 50dB, Oak veneer finish to match joinery within the area.
Two inset pass door panels for access through the screen.
Two glazed vision panels with solid oak timber beading.
Timber paneling applied to panels in central area.
All panels needed to lie up exactly with timber beams.
Recessed stacking with cupboard doors to recess.
Framework installed to steel box section.
Scope of Works
- Head track fitted to steel box section with unistrut and threaded rod framework.
- Installation of panels.
- Installation of electrical control box within the ceiling.
- All panels levelled.
