0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ACOUSTIC VERIFICATION SCHEME
    • BRITISH STANDARDS
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • DIGITAL CONSTRUCTION
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • ORGANISATIONAL CAPABILITY
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • CAREERS HUB
    • COMPETENCY TOOLKIT
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
      • FIS ACADEMY
    • FIS ACADEMY
    • FUNDING YOUR TRAINING
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • RECRUITMENT
    • TRAINING AWARDS
  • SPECFINISH
Join us
Sign in

University of the West of Scotland, Hamilton

The Project

The project involved us undertaking Internal Fit Out packages for the new teaching facilities at the University of the West of Scotland.
The building which was a conversion of three existing separate pavilions into 3no separate teaching wings spread over three floors and one newly created ‘Street’ link area.
Our works packages comprised of the Drywall Partitions and Linings, Door-sets, Ironmongery, Skirtings, Glazed Demountable Partitions, Altro Whiterock and finally the Glazed Fire-screens over the atrium.
Our project works were completed over an on-site duration of approx. 14mths and a final project value of circa £2.5m. The biggest challenge on the project were the loading out of the facilities due to there being restricted loading out zones, caused by the on-going works to create the new link ‘Street’ facility on the main frontage of the facility, all materials had to be hoisted in small pallet loads on to a landing platform on each floor plate via the rear of the facility and then manually distributed across and through each level and wing. A most difficult though would be the loading out towards the final stage of the build, when the Glazed Fire-screens were to be installed to the atrium areas on each floor and each wing, this was carried out by manual handling of the glass and frames.

www.veitchi.com

Project Type

  • Partitioning

Location

  • Hamilton

Value

  • 550K

Sector

  • Education

Architect

  • Mosaic Architecture
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.