The Loftings, Berkshire
The Project
The project consisted of 145 Apartments over 5 low rise blocks utilising Gypwall Quiet acoustic separating wall system with Gypwall Classic internal walls. Casoline MF concealed grid ceiling system was installed and elements of Gyroc Shaft and Duct encasement systems. RPN produced a seamless surface finish ready for decoration. This was an extremely challenging project due to a tight programme of 40 weeks.