0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Square Gardens, Manchester

Click to watch video

Click to watch video

Click to watch video

1/8

The Project

Linear Projects are proud to have completed the ceilings, partitions and plastering works on a landmark 44-storey, 644-bedroom development in the centre of Manchester. Spanning two years, the scheme has been a true team effort, bringing together their client Downing, their supply chain and project personnel to deliver a consistent, high-quality finish – including ceilings, partitions, and spray plaster – across every level of the building.

From the outset they established a rigorous quality-control process to ensure all works met the project’s strict standards. Fire safety and acoustic performance were key requirements, and each system was carefully installed and inspected to guarantee compliance and consistency throughout the development.

They also benefitted from excellent technical support from British Gypsum, Knauf and Siderise, whose systems and expertise enabled them to meet the specified performance standards across more than 20 different wall and ceiling types. Working closely with SimpsonHaugh Architects, they ensured the design intent was fully realised while maintaining efficiency and buildability at every stage.

The development is a striking addition to Manchester’s skyline, and they are delighted to have contributed to bringing it to life. Its success reflects the collaboration, skill, and dedication of everyone involved, with materials supplied by CCF and FNW.

Scope of Works

  • British Gypsum Drylining Partition, Ceiling & Plastering Systems
  • Acoustic & Thermal Insulation
  • Knauf Spray Plaster
  • Suspended Ceiling Systems
  • Siderise Fire Vertical Cavity Barriers
  • Fermacell Boarding
  • Rockwool Insulation
  • Plywood Timber Doors & Pattresses
  • VTEC Bespoke Laminate Timber Ceilings
  • Unistrut Secondary Grid
  • SFS Lining
  • Access Panels & Riser Doors (Bespoke)
  • Curtain Trims (Bespoke)

Linear Projects

Project Type

  • Drylining
  • Drywall Construction - residential

Location

  • Manchester

Value

  • £8.3m

Supplier

  • Arco
  • Arnold Laver & Co
  • British Gypsum
  • Caley Group
  • CCF
  • Craighead Building Supplies
  • Ejot UK
  • Fastbuild Supplies
  • Fermacell
  • Fixings North West
  • Hilti
  • Knauf
  • MEP Hire
  • Minster
  • Onestop Hire
  • QIC
  • Rapid Access
  • Rockwool
  • Siderise Insulation
  • SIG
  • Spit UK

Architect

  • Simpson Haugh
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.