Square Gardens - Block D, Manchester
The Project
We’re proud to have completed the ceilings, partitions and plastering works on a landmark 44-storey, 644-bedroom development in the centre of Manchester. Spanning two years, the scheme has been a true team effort, bringing together our client Downing, our supply chain and project personnel to deliver a consistent, high-quality finish – including ceilings, partitions and spray plaster – across every level of the building.
From the outset we established a rigorous quality-control process to ensure all works met the project’s strict standards. Fire safety and acoustic performance were key requirements, and each system was carefully installed and inspected to guarantee compliance and consistency throughout the development.
We also benefitted from excellent technical support from British Gypsum, Knauf and Siderise, whose systems and expertise enabled us to meet the specified performance standards across more than 20 different wall and ceiling types. Working closely with SimpsonHaugh Architects, we ensured the design intent was fully realised while maintaining efficiency and buildability at every stage.
This development is a striking addition to Manchester’s skyline, and we’re delighted to have contributed to bringing it to life. Its success reflects the collaboration, skill and dedication of everyone involved, with materials supplied by CCF and FNW.
Scope of Works
- British Gypsum Drylining Partition, Ceiling & Plastering Systems
- Acoustic & Thermal Insulation
- Knauf Spray Plaster
- Suspended Ceiling Systems
- Siderise Fire Vertical Cavity Barriers
- Fermacell Boarding
- Rockwool Insulation
- Plywood Timber Doors & Pattresses
- VTEC Bespoke Laminate Timber Ceilings
- Unistrut Secondary Grid
- SFS Lining
- Access Panels & Riser Doors (Bespoke)
- Curtain Trims (Bespoke)