Shireland CBSO Academy, West Bromwich
The Project
Originally an office building, the transformation of the Shireland CBSO Academy into a cutting-edge educational institution specialising in music with world-class acoustics has been a monumental achievement. Central to this remarkable conversion is the dry-lining installation which has redefined the space.
The academy’s bustling location in the heart of the United Kingdom demanded innovative methods to ensure the highest performance acoustics were achieved. The installation of partitions and ceilings was pivotal in creating an environment where the fusion of education and music seamlessly coexist. These installations were not just about practicality but also about enhancing the aesthetic appeal of the learning environment.
With the exceptional synergy between the project designers and the on-site construction team, the space is now a powerful testament to the transformative effects of the alterations, providing its students with a uniquely enriching experience. The seamless collaboration between designers and the construction team was essential in addressing the formidable challenges of achieving the cutting edge sound quality whilst preserving the meticulous aesthetics of the space, setting it apart from any other institution in the country.
Scope of Works
Partitions
Ceilings
Tape and joint
Plastering
Soundproofing