Robertstown Regeneration, Aberdare
The Project
The project threw up various challenges that started with the quick design turn around to get the project progressing through Pandemic times when the majority of the nation were on Furlough. The 13 meter raking span of the gable ends pushed the SFS design to the extreme limits resulting in reduced centres and increased section sizes and gauges. The fast paced installation confronted us with various challenges from the outset that required collaboration with the other trades to overcome various issues including eaves and verge details to maintain the required building fabric and integrity.
Scope of Works
Column and Beam encasements – Firecase F system – British Gypsum
SFS – Caledan with British Gypsum Linings
High Bay walls – Speedline sections with BG Linings
Internal Linings – British Gypsum