0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

Regents University, London

The Project

Quest worked in collaboration with Regents & Gunn Associates, to fully refurbish the existing Refectory and increase capacity whilst also providing additional breakout space for the staff and students at Regents.
The works included installing a new mezzanine with two suspended staircases tied in to the structure and with a strong timber slatted handrail bringing the design together.
As part of the work Quest also installed a new ventilation system, feature lighting and underfloor heating system developed to ensure the mezzanine thickness was kept to the minimum to ensure the feature timber handrail remained the main focus.

The project involved a tremendous number of trades to overlap and ensure the project was completed on time and too a high standard. This brought the biggest challenge on creating a team working environment to which all worked in unison. This was down to our strong site management and cooperation from our client Regents.

The Existing Freeze was kept as an acknowledgement to the heritage and history of the building and the space to which we feel has been achieved.

www.questinteriors.com

Project Type

  • Interior Fit Out

Location

  • London

Value

  • 500K

Sector

  • Commercial

Architect

  • Gunn Associates
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2025 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.