0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ACOUSTIC VERIFICATION SCHEME
    • BRITISH STANDARDS
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • DIGITAL CONSTRUCTION
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • ORGANISATIONAL CAPABILITY
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • CAREERS HUB
    • COMPETENCY TOOLKIT
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
      • FIS ACADEMY
    • FIS ACADEMY
    • FUNDING YOUR TRAINING
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • RECRUITMENT
    • TRAINING AWARDS
  • SPECFINISH
Join us
Sign in

Piccadilly Theatre, London

The Project

The Ambassador Theatre Group under took to bring back their original scheme and refurbish the main dome which has been covered up for many years.
The works included a full redecoration and re-construction of the EML rendered ceiling and the surrounding original fibrous plaster works.
Hayles and Howe were approached to help design a methodology to reconstruct the dome by filling in all the large holes and repairing the damaged caused over the years. The dome was covered with a large metal grid which supported all the theatre spot lights and other technical equipment. This was removed and a platform was put in place to enable the works to proceed.
There were many technical challenges during the project including plasterer’s ellipses using old techniques along with manufacturing, installing a new access points in the ceiling for future shows, designing new features for the ceiling, consolidating the lattice cove, and surrounding lighting troughs within a very strict timeline of 4-6 weeks.
The theatre is now back to its original beautiful design, provides the theatre with better light, ambience, and feel when watching the shows.

www.haylesandhowe.co.uk/

Project Type

  • Heritage plastering

Location

  • London

Value

  • 150K

Sector

  • Commercial

Architect

  • Jay Bourley
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.