0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ACOUSTIC VERIFICATION SCHEME
    • BRITISH STANDARDS
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • DIGITAL CONSTRUCTION
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • ORGANISATIONAL CAPABILITY
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • CAREERS HUB
    • COMPETENCY TOOLKIT
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
      • FIS ACADEMY
    • FIS ACADEMY
    • FUNDING YOUR TRAINING
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • RECRUITMENT
    • TRAINING AWARDS
  • SPECFINISH
Join us
Sign in

Peelers Yard, Manchester

Click to watch video

Click to watch video

Click to watch video

1/4

The Project

V&D Interiors delivered the load-bearing SFS package at Peelers Yard, an eight-storey residential development comprising 81 apartments, including duplex penthouses and townhouses.

Unlike conventional infill SFS, the light gauge steel framing forms an integral part of the building structure, creating external and internal walls, floors and roofs.

The engineered system incorporated approximately 12,241m² of wall framing and 5,693m² of floor and roof cassettes, with pre-panelised assemblies weighing up to approximately one tonne. Factory-prefitted bracing and sheathing reduced site fabrication and material waste while improving installation efficiency and consistency.

The project presented significant technical challenges. Differences between the coordinated design and constructed structure required V&D and the design team to review, redesign and alter affected panels while maintaining structural requirements and construction progress.

Complex duplex areas incorporated steeply pitched roofs, sloping walls and ceilings and multiple intersecting SFS planes.

The new structure was also delivered around retained elements of the historic former police and fire station site, including its landmark 25-metre Victorian chimney stack.

Installation quality was independently monitored through third-party QA visits approximately every three weeks.

Scope of Works

  • Pre-panelised SFS external walls
  • Pre-panelised SFS internal walls
  • SFS floors
  • SFS roofs
  • Sheathing boards

V&D Interiors

Project Type

  • Steel framed systems

Location

  • Manchester

Value

  • £625k

Supplier

  • FrameClad

Architect

  • Tim Groom Architects
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.