0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ACOUSTIC VERIFICATION SCHEME
    • BRITISH STANDARDS
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • DIGITAL CONSTRUCTION
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • ORGANISATIONAL CAPABILITY
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • CAREERS HUB
    • COMPETENCY TOOLKIT
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
      • FIS ACADEMY
    • FIS ACADEMY
    • FUNDING YOUR TRAINING
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • RECRUITMENT
    • TRAINING AWARDS
  • SPECFINISH
Join us
Sign in

One Port Street, Manchester

Click to watch video

Click to watch video

Click to watch video

1/10

The Project

One Port Street is a landmark residential development comprising 477 luxury apartments and extensive communal facilities in Manchester’s Northern Quarter.

One Port Street, Manchester — Steel Framed Systems

Rapidfix delivered the complete Steel Framed Systems (SFS) package across three podium blocks of 6, 8 and 10 storeys at One Port Street, a landmark residential development in Manchester’s Northern Quarter.

The installation incorporated the Remagin and Siniat THRUWALL infill system, with individual steel studs and tracks assembled entirely on site within the reinforced concrete structure.

The project demanded precise setting out and complex structural detailing across multiple elevations, incorporating specialist cleats, brackets, reinforced window openings and non-standard fixing arrangements. The engineered design included a 25 mm deflection allowance to accommodate structural movement.

Rapidfix’s management team worked closely with Renaker, Remagin, Siniat and specialist manufacturers to coordinate and develop project-specific solutions, improving buildability and the integration of the external wall system.

Workmanship was supported by extensive photographic quality-assurance records and independent manufacturer inspections throughout construction.

Delivered as part of Rapidfix’s wider £7.6 million specialist contract, the project demonstrates the technical expertise, collaborative approach and installation craftsmanship required to successfully deliver a complex, multi-block SFS package.

Scope of Works

  • Complete installation of the Remagin and Siniat THRUWALL Steel Framed Systems (SFS) infill package across three podium blocks of 6, 8 and 10 storeys.
  • On-site assembly and installation of light-gauge steel studs, head tracks, base tracks and associated framing components.
  • Setting out and installation of SFS framing within the primary reinforced concrete structure.
  • Installation of specialist structural cleats, brackets, support angles and engineered fixing connections.
  • Formation of reinforced window openings, lintels, jambs, cills and non-standard framing details.
  • Installation of deflection head tracks and connections incorporating the specified 25 mm structural deflection allowance.
  • Installation of Siniat Weather Defence external sheathing boards and associated fixing systems.
  • Installation of EPDM membranes, air and vapour control layers, weather-sealing membranes and associated interface details.
  • Coordination and detailing of SFS interfaces with glazing, masonry support systems, concrete slab edges and external façade construction.
  • Development and coordination of project-specific installation details alongside Renaker, Remagin, Siniat and specialist manufacturers.
  • Implementation of comprehensive quality-assurance inspections, photographic records and manufacturer-supported installation checks.

Rapidfix Ceilings & Partitions

Project Type

  • Steel framed systems

Location

  • Manchester

Value

  • £7.5m

Supplier

  • Illbrook/tremco
  • Remagine
  • Siniat

Architect

  • Simpson Haugh
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.