0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

One City Park, Bradford

Click to watch video

Click to watch video

Click to watch video

1/7

The Project

One City Park is a 5-storey office building in the heart of Bradford City Centre. It’s the first high-quality grade A, sustainable, modern workspace to be delivered in Bradford for more than 20 years.
B&K Systems Ltd were privileged enough to be awarded the project and constructed the partitions, the majority of which being shaft wall, insulation, MF ceilings, skim finishes, fire curtains, Hunter Douglas acoustic rafts, SAS blind boxes, feature curved bulkheads and specialist SAS ceilings and rafts, screeds and underfloor heating. The project was a challenging build with time constraints and and an array of challenges including collaborative working. However, through our assistance we helped to develop the interface between all other trades and our ceilings and walls inherently saving time and money. The perimeter of the office space presented significant challenges from following the faceted curtain walling with our blind box to seamlessly transitioning through the MF ceiling into a beautiful, curved trim and SAS metal ceiling tile. The design, detail, and quality of the installation throughout this project is inspiring. We wanted to be a part of the vision and we believe that we have helped to create a stunning workspace designed for the end user.

Scope of Works

Internal Partitions
MF ceilings
Bulkheads
Curved Bulkheads
Suspended SAS Ceilings
Suspended SAS Rafts
Suspended Hunter Douglas Acoustic Raft

b-k-systems.co.uk/

Project Type

  • Plastering
  • Plastering (Internal)

Location

  • Bradford

Value

  • 1.42M

Sector

  • Commercial

Supplier

  • CCF
  • Fixings North West
  • Hilti
  • Hunter Douglas
  • Wakefield Timber

Architect

  • Sheppard Robson
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2025 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.