0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

No.1 Lambeth Highstreet, London

The Project

Complexity of Project.

Errigal Contracts were contracted to provide the full through wall build up from SFS out to finished Gebrik & rainscreen cladding to Palace View in the Lambeth. Gebrik was proposed by Errigal as a program saving alternative to traditional brickwork. The SFS
The structure was a post tension slab which caused some coordination & specification issues with regards setting out and SFS and fixing locations. The tolerance to be achieved on the SFS build of +-2mm achieved throughout to allow installation of Gebrik façade. All windows and doors, which were tripled glazed, were support off the SFS. The curved elevations on the project caused some challenges as the SFS had to be faceted regularly to achieve the tight radii. M&E coordination did not happen as early in the project a necessary and as a result Errigal had to design a bespoke brackets to allow vent ducts to pass through the jambs stud locations. Also due to issues with the concrete slab edge tolerances Errigal had to design post fix self angles to the slab edge to allow SFS fixing.
Evidence of collaboration.
Errigal proposed the change to a Gebrik facade to speed up build programme instead of traditional brick. This had the side effect of improved thermal specification achieving a U-Value of 0.11. This was done in collaboration with the design team with Errigal produced detailing to feed in the Architects & Structural Engineer BIM model. The SFS was all ordered cut to length to avoid site cutting & waste as much as possible.

www.errigalcontracts.co.uk

Project Type

  • Steel framed systems

Location

  • London

Value

  • 2.7M

Sector

  • Residential

Architect

  • White Ink Architects
Arrow Created with Sketch. Back to Gallery