0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Network Building, London

Click to watch video

Click to watch video

Click to watch video

1/18

The Project

Nine storey (including basement) shell and core office building. Offices and retail units on the ground floor, levels 1 to 8 an open office floor plate with backs of toilets east and west of the central core. Titan have built risers to all levels, liner walls to all levels, toilet cores to al levels, Acoustic ceilings on levels ground and level 1, and grid ceilings on all levels. Clay plaster finish to walls in the reception and basement shower rooms.

Scope of Works

  • Internal party walls, partitions & linings
  • Sacrificial board layer and forming of recessed skirting detail
  • Linings to external walls (curtain walling & precast concrete panels), mixture of gypliner, 60 I 70 stud lining, and hybrid system with both to allow for intumescent expansion zone for beams. VCL by facade contractor
  • MF ceilings to general areas
  • Rockfon Blanka planks to GF offices
  • Thermatex acoustic planks to superloos on each floor core
  • Tape and joint finish to walls (SFS walls to external)
  • 2x layers of soffit slab to basement and GF
  • Access panels
  • Pattressing
  • Buildersworks
  • Beam encasements (Glasroc)
  • Bulkheads/feature bulkheads
  • Blindboxings fixed with Zbar
  • Clayworks plaster
  • ROCKFON ceiling in reception area

Titan Interior Solutions

Project Type

  • Drylining
  • Drywall Construction - commercial

Location

  • London

Value

  • £2.479m

Supplier

  • British Gypsum
  • CCF
  • Rockfon
  • Thermatex

Architect

  • Piercy & Company
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.