0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

University of Birmingham

The Project

Working in close collaboration with architect’s Sheppard Robson, the Grimes Finishings’ site team engaged British Gypsum’s technical team to help develop the NBS specification and produce a project specific systems pack for the scheme. The pack incorporated various British Gypsum interior lining systems, including a number of its GypWall lightweight metal framed partition and wall systems. Designed to meet the most demanding fire resistance, sound insulation, impact and height requirements, the GypWall systems were the ideal solution for the project’s unique requirements.
Commenting on the process, Tony Fitzgerald, Senior Product Manager at Morgan Sindall, said, “It was crucial for us that the specification and project pack were followed to the most finite detail to ensure excellent quality and system performance throughout the high-performance space. Grimes Finishings’ full time dedicated quality control manager worked closely with the University’s Clerk of Works and British Gypsum’s technical representatives to ensure the highest possible installation quality throughout the process.”
Completing the Collaborative Teaching Laboratory at University of Birmingham’s Selly Oak campus was amongst the most challenging builds the University had ever attempted posing both unprecedented technical and programme challenges throughout. The project handed over on time to the client on Monday 30th July 2018.

www.grimesuk.com

Project Type

  • Drywall Construction - commercial

Location

  • Birmingham

Value

  • 675K

Sector

  • Education

Supplier

  • British Gypsum

Architect

  • Sheppard Robson