0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ACOUSTIC VERIFICATION SCHEME
    • BRITISH STANDARDS
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • DIGITAL CONSTRUCTION
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • ORGANISATIONAL CAPABILITY
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • CAREERS HUB
    • COMPETENCY TOOLKIT
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
      • FIS ACADEMY
    • FIS ACADEMY
    • FUNDING YOUR TRAINING
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • RECRUITMENT
    • TRAINING AWARDS
  • SPECFINISH
Join us
Sign in

Middlewood Locks,, Manchester

The Project

Middlewood Locks, was predominantly a residential development with a small section of retail space to the ground floor areas. The development consisted of 572 apartments across 6 blocks and 34 different floor plates.
The principal contractor for the development BCEGI; awarded the internal partitions, MF ceilings, plastering, SAS ceiling system within the blocks, bespoke SAS bulkhead and ceiling system to the car park areas, firestopping, weatherproofing and acoustic treatment package to Horbury Building Systems.
The project was driven from the offset by HBS who catapulted the project at peak, 12 weeks in front of the target programme which was eventually evened out with other sub-contractors coming on line, achieving completion of the works in line with the programme.
HBS were responsible for design engineering the performance specification alongside Speedline and SAS for the ceilings and car park bulkhead to achieve the performance set out by the architect.
HBS also strived towards reducing the environmental impact of the works by offsite manufacturing of bespoke lengths of metal components and plasterboard to reduce the waste product created during install.

www.horburygroup.com/

Project Type

  • Drywall Construction - residential

Location

  • Manchester

Value

  • 4.7M

Sector

  • Residential

Supplier

  • SAS International

Architect

  • Whittam Cox Architects
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.