International Conference Centre, Wales
The Project
The challenges involved with delivering the partitions and ceilings at the prestigious ICCW, (Celtic Manor), project were unprecedented for Manorcraft.
The exceptional working heights and architectural detailing pushed the very limits of conventional drywall. The challenges were exacerbated by the demanding performance requirements necessitated by the multi-function performance building. The overlapping design and construct, coupled with an accelerated programme and exceptional access requirements necessitated maximum coordination with both the preceding and following trades, sometimes involving working in split shifts and in conjunction with all parties simultaneously.
Manorcraft Interior Systems is proud to be involved with such a prestigious building which is no doubt the most significant conference centre in Wales.