0121 707 0077 info@thefis.org
  • X
  • Instagram
  • X
  • Instagram
FIS
  • HOME
  • ABOUT US
    • ABOUT US
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • FIS CAMPAIGNS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • QUALITY MANAGEMENT & THE BUILDING SAFETY ACT
    • SUSTAINABILITY
    • SUPPORT FOR SPECIFIERS
    • ACOUSTIC VERIFICATION SCHEME
    • HEALTH & SAFETY
    • BUSINESS & TAXATION
    • DIGITAL TOOLKIT
    • CONTRACTUAL & LEGAL
    • EMPLOYMENT
    • BREXIT TOOLKIT
    • CONTINUING PROFESSIONAL DEVELOPMENT (CPD)
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS HUB
    • MANAGE ACCOUNT
    • AWARDS
    • PUBLICATIONS
    • WORKING GROUPS
    • SPONSORSHIP
    • REFER A MEMBER
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY
    • APPRENTICESHIPS & QUALIFICATIONS
    • CPD
    • CAREERS
    • RECRUITMENT & INDUCTION SUPPORT
    • SKILLS & TRAINING FUNDING
    • TRAINING AWARDS
    • TRAINING DIRECTORY
    • TRAINING OFFERS
    • JOB BOARD
  • SPECFINISH
  • MEMBERS LOGIN
Select Page

Manchester Airport

Click to watch video

Click to watch video

Click to watch video

1/5

The Project

Manchester Airport Transformation Project – Terminal 2, a development to increase the size of terminal 2 by 50%. this included the installation of bespoke GRG and ceiling systems incorporating SAS international systems 500, 205, 600, 130, 150, 330, with bespoke sublimated baffles and Knauf plasterboard bulkheads.

SCS were responsible for the design and manufacture of several bespoke GRG bulkheads installed in all main departure and arrival lounges. These were engineered to work with and around the mechanical and electrical installation. SCS also installed SFS flooring to the main arrivals lounge which created fire rated spaces. SCS also installed durasteel blast proof ceilings to high risk areas.

To the departure areas, all ceilings were installed as ASIAD secure ceilings, which included bespoke designs for securing the tiles.

The work areas were a mix between landside and airside working, which required enhanced security clearance of SCS operatives and management.

Scope of Works

SAS Ceilings
Sublimated Baffles
Knauf Plasterboard Bulkheads
GRG Bulkheads
SFS Floor PlateASIAD Ceilings

www.scs-group-uk.com

Project Type

  • Ceilings

Location

  • Manchester

Value

  • 6 million

Sector

  • Leisure

Supplier

  • GRG
  • Knauf
  • SAS International

Architect

  • Pascall and Watson
Arrow Created with Sketch. Back to Gallery
  • X
  • Instagram
© 2022 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.