LSH Mercedes Benz, Stockport
The Project
The project comprised the construction of a 3-storey Mercedes Benz Autohaus showroom linked to a body repair and paint workshop with a re-marketing suite over two lower floors and a car park spanning all three.
The contract included Joinery, Siniat metal stud partitions, glazed screen partitions, MF ceilings, and Ecophon rafts and baffle system ceilings. The showroom was spread over three floors with the upper floor having a Siniat Pregybel MF ceiling that was over 2700m2, which is the largest single MF ceiling undertaken by Horbury.
On the lower ground floor, Horbury installed 2300nr Ecophon solo baffles to the sales area, plus an Ecophon Master Matrix System.