0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Linde Demo Area, Basingstoke

Click to watch video

Click to watch video

Click to watch video

1/25

The Project

We transformed the current warehouse storage area into a multi-purpose demonstration theatre.

A versatile demonstration area designed for use by multiple people. The space will serve both as a sales showcase area and a training environment allowing teams to experience products and solutions in a hands-on setting. Beyond its practical use of supporting live demonstrations, training sessions and client presentations, it has become a space that has bought the whole company together as a social hub, hosting charity events and team activities to help foster connection and boost morale.

Scope of Works

  • To carry out the refurbishment works of the existing warehouse and create a new Demo theatre show room.
  • Full strip out of existing services including any obsolete equipment.
  • New Mezzanine floor to include the following. Ground floor – Break out area, Locker area, Meeting room and toilet block to include female / male toilet. First floor – Break out space, theatre stage seating and training room with a view to the demo area.
  • New Demo area will have a full black 600×600 suspended ceiling to help with acoustics and insulation and to contain any services. Dryline system will be installed to all perimeter walls to complete a smooth finished wall.
  • New Zone areas to be completed to final design which will include full lighting, flooring, feature walls and MEP works.
  • Full HVAC system to be installed as final design and approval.
  • 2no speed shutter doors will be installed to existing openings
  • New opening to be created for a “shop front” look and infill existing exit or tidy up for additional fire exit.
  • 70m of covered walkway to be installed with drainage.
  • Full electrical rewire, lighting and data to be installed to final layout.
  • Decoration works to be completed throughout

Astra Office Interiors

Project Type

  • Interior Fit Out

Location

  • Basingstoke

Value

  • £900k

Supplier

  • Brewers
  • Burmatex
  • CCF
  • Clovis Canopies
  • Crown Paints
  • Direct 2 U
  • Eurocell
  • Howdens
  • Huws & Gray
  • MH Doors
  • Nationwide platforms
  • NDI
  • Screwfix
  • Toolstation
  • Tradechoice
  • Travis perkins
  • Verco
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.