0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Jenner & Block, London

Click to watch video

Click to watch video

Click to watch video

1/7

The Project

Private Commercial Office Fit-Out – partitions, ceilings, and doors.
Consisting of Pods, metal raft ceilings, mesh ceilings and MF. All
Partitions required to be built to high decibel rating of 59dB together with
interfacing with glazed partitions.
Situated in Liverpool Street, London, Space were appointed the partitions
and ceilings contractor for this modern and timeless fit-out, with a
contemporary look and feel, for an upmarket client. Taking the above into
consideration, the client wanted to maintain a professional and corporate,
yet welcoming and safe environment.
This could only be achieved with a combination of high-end integrated
ceiling types, together with the correct interface to other aspects of the
build. To maintain their client’s privacy, the partition specifications
needed to meet a minimum 59dB rating, slab to slab construction. The
project had a fast-track program, with an execution period of 10 weeks.
Space achieved the project milestones as required by the client.

Scope of Works

• 59dB Partition 3850mm high
• 59dB Partition Celestory type
• Acoustic Plasterboard Barriers
• MF Ceilings – including troughs, lights
• Metal Perforated Ceiling Tiles

www.spaceinteriorsystems.co.uk/

Project Type

  • Partitioning

Location

  • London

Value

  • 340k

Sector

  • Commercial

Architect

  • MCM
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.