0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

Holloway Head Internals Phase 1, Birmingham

Click to watch video

Click to watch video

Click to watch video

1/8

The Project

Drywall Contracts has been collaborating with Winvic Construction on the development of Holloway Head, one if Birmingham’s largest PRS (Private Rented Sector) schemes. The site, located just a ten-minute walk from Birmingham City Street station, has been vacant for over 25 years. It’s redevelopment is part of the broader regeneration of Birmingham City Centre under the Big City Plan.

The modern design consisted if four blocks ranging from 10 to 16 stories, adapting to the challenging, steeply sloping topography of a 13m drop across the site. The 485 apartments are divided into 132 one-bedroom, 344 two-bedroom, and 9 three-bedroom apartments. The scheme offers extensive resident amenity space including a media lounge, co-working spaces, formal lounges, dining area, gym, landscaped courtyards, and roof terraces. Additionally, 3,660 sq. ft of commercial space is available at the ground level to activate street presence.

A new Girl Guides headquarters was built on the south site as they vacated their existing HQ building, Trefoil House located on the north end of the site. The new headquarters will include multiple activity rooms, a common rooms, a large main hall and a shop.

This project was very challenging as the design was based on Pre-Grenfell specifications. DCL worked closely with the design team to introduce changes, such as updating smoke shafts, junction interfaces, upgrading firefighting lobbies, removing combustible materials from the façade build up and increasing the performance of corridors and party walls. Due to the nature of Phase One, the slope of the ground, and the requirement to have part of the Phase One occupied during construction to allow Trefoil House to be demolished, we had to produce a logistical plan for our client that included changing the location, orientation, and size of hoists on the project to maintain program and resource levels.

Scope of Works

  • Complete Fit-out to the New Girl Guides
  • Upgrade to the performance of the slabs on the lower levels
  • Drylining and Plastering to Phase 1 (Blocks C and D) 231 Apartments

DrywallContracts

Project Type

  • Partitioning

Location

  • Birmingham

Value

  • 3.7M

Supplier

  • British Gypsum
  • Ecophon
  • Kemwell
  • Rockfon
  • Rockwool Soffit slabs

Architect

  • Corstorphine & Wright
Arrow Created with Sketch. Back to Gallery