Hill Dickinson Stadium,
The Project
A fully bespoke design on multiple areas across the west stand, incorporating SAS 330 deep profiles and mega panels SAS 700, 1003 perf and walnut veneer effect tiles SAS System 130 Mesh floating rafts and Amron floating rafts with mesh tiles.
Scope of Works
- We have installed a inistrut subgrid installed below base build services to take a load of 500kg per m2.
- We then installed SAS / Amron Ceiling systems as above write up.
- We have also installed MF Ceilings with circular feature bulkheads and light troughs.
