0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Haymarket Square, Edinburgh

Click to watch video

Click to watch video

Click to watch video

1/5

The Project

Our install comprised of linear rib profiles creating a horizontal frieze at each floor level. The scenic lifts were formed with vertical frontages of rib profiles that rose either side, with the gable ends of the lift cores capped off with black attenuating metal panels.

The main office elevations where the floor level and ceiling void occurred, provided the zone for Metsec SFS support frame, as well as providing restraint for the glazed screens. The scenic lift areas required a complex install of SFS and I stud framing to allow the profiles a secure point tie back.

Within the lift lobby areas, a mixture of Gustafs ribs and bespoke high gloss panelling was installed to our supporting background.

Additional packages included the atrium stair. The works compromised installing boarding to the inside and outside face of the stair plus the soffit. Due to the complex nature, the panels required on site templating in advance of production. This was carried out as the cladding rail system was installed in challenging conditions.

The second element of works was Acoufelt wall panels within the main floor plates. The panels selected meant that each of the rooms had its own bespoke pattern and colour.

Scope of Works

  • Linear Rib Linings
  • SFS Framing
  • I Stud Framing
  • Board Lining and Cladding Rail System to Feature Stair
  • Acoustic Panel install with timber batten supports
  • Acoustic metal wall panels

Project Type

  • Drylining
  • Drywall Construction - commercial

Location

  • Edinburgh

Value

  • £5m

Supplier

  • Acoufelt
  • British Gypsum
  • Equitone
  • LSA Projects Ltd
  • Metsec
  • SAS International

Architect

  • Foster & Partners
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.