

Crescent Hotel and Spa, Derbyshire
The Project
BW Shrimpton were contracted by Vinci Construction to Design, Supply and Install the Drylined Walls, Partitions, MF Ceilings and Lay-in Grid ceilings on this Grade 1 Listed Building. The contract period was over 2 1/2 years. With over 100 different wall and ceiling types with hundreds of drawings and details.
Scope of Works
Fire Rated/ Acoustic Mass Barrier Ceilings
Metal Stud Partitions
Timber Stud Partitions
Independant Wall Linings
Gypliner Wall linings
Shaftwall
2 Coat Plaster
Lay in Grid ceilings
MF Ceilings
MF Bulkheads and Coffers
High Humidity Masterboard Ceilings
Steridex high humidity paint