0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

Co-op Live Arena, Manchester

Click to watch video

Click to watch video

Click to watch video

1/3

The Project

Home to the UK’s largest indoor arena, the Co-Op Live Arena has been one of the most impressive large-scale projects of its type that Measom have been involved in. Our scope of works include the full drylining package, partition walls, plastering, MF ceilings and lighting bulkheads. All aspects were built to a high-performance specification, with rigorous standards for fire and acoustics, crowd loadings, security and large deflections.

Speaking of our works, Josh Kendall, BAM Project Manager said “Measom undertook drylining and ceiling packages on the Co-Op Live Project. Their knowledge and expertise were vital in ensuring this was a successful relationship on an incredibly challenging project. Measom offered technical support and liaised with the architectural team to offer design solutions prior to issues being faced on-site. They constantly offer a proactive, user-friendly approach and ensure works are completed to the highest of standards.”

Level 2 contains spectacular lighting features formed by creating specialist vaulted ceilings with curved apertures. These required high levels of precision to reach the aesthetic requirements. The bars needed heavy-duty walls to support the steel framework for bottle displays.

Overall, the final result at Co-Op Live Arena is something we are incredibly proud of and looks outstanding.

Scope of Works

• Full drylining package
• Beam and column encasements
• Partitions
• Plastering
• MF ceilings
• Rigitone ceilings
• Lighting bulkheads

MeasomDryline

Project Type

  • Acoustic Excellence

Location

  • Manchester

Value

  • 10.5M

Sector

  • Commercial

Supplier

  • ASAP
  • British Gypsum
  • Ceildoor
  • Promat
  • Rapid Access

Architect

  • Populous
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2025 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.