0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Future Beauty Labs, Glasgow

Click to watch video

Click to watch video

Click to watch video

1/19

The Project

Refurbishment of Ground floor office space to create a modern vibrant office space for leading cosmetics brand Future Beauty Labs. The design was created by GFiveThree Architects in conjunction with the client to bring a modern and vibrant feel creating an inviting and comfortable workspace.

Works began with the strip out of staircase connecting the ground floor and 1st floor office plates and infill of structural floor between the floor plates. All connected M&E installations between the floors had to be separated such as data, power, lighting & heating controls.

Once the separation was complete the strip out of existing installation commenced including the removal of office partitions, glazed screens, kitchen installation, floor coverings, data, lighting etc. Specific installation such as the folding partition, kitchen units and doors were carefully removed and set aside for reuse in the new refurbishment to both reduce both environmental impact and costs.

Scope of Works

• Full height acoustic drywall partitions,
• Acoustic double-glazed screens,
• Vinyl and Carpet floor coverings,
• bespoke floating ceiling rafts,
• Kitchen and tea prep installation,
• Bespoke joinery,
• Wall Tilling,
• decoration,
• Lighting,
• Data,
• Small power
• Fire Alarms
• Sprinkler Works
• BMS.

ClansmanInteriors

Project Type

  • Interior Fit Out

Location

  • Glasgow

Value

  • £790k

Supplier

  • Apton Partitioning
  • Forza
  • Galaxy Insulation
  • Howdens Joinery
  • MGM Timber
  • Minister Insulation
  • QIC
  • St Andrews Timber
  • Vitra

Architect

  • Gfivethree
Arrow Created with Sketch. Back to Gallery
  • Instagram
© 2026 Finishes and Interiors Sector Ltd. Registered in England & Wales No. 3403977.