0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • CORE TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY TOOLKIT
    • BUILDING SAFETY ACT
    • BUSINESS & LEGAL TOOLKIT
    • SUSTAINABILITY TOOLKIT
    • HEALTH & SAFETY TOOLKIT
      • MENTAL HEALTH HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • E-LEARNING HUB
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • MEMBERS LOGIN
  • SPECFINISH

Bradford Live, West Yorkshire

Click to watch video

Click to watch video

Click to watch video

1/8

The Project

Our scope of works was to reinstate the original ceilings and features to the following areas of the former Art Deco Odeon Cinema:

• Ballroom.
• Cabaret Bar.
• Auditorium Balcony Front (part).
• Staircase 1, including entrance area.
• Staircase 1 VIP Bar Ceiling and wall features.
• North Turret Ceiling.
• South Turret Ceiling.
• Staircase 2 Barrel Vaulted Ceiling (part).
• Staircase 2 VIP Bar.

The original intention was to retain and restore ceilings and features where possible, but after many years of the building being derelict and subject to no heating and water ingress, this was not possible. The fibrous plaster casts had all but perished and the jute hessian scrim and timber lath reinforcement had rotted.

The Architects and client decided to re-manufacture all the mouldings with brand new sections, all to match the original sizes, but updated to incorporate modern lighting and ventilation systems on metal framework suspension to support the new fibrous plaster casts.

Scope of Works

• Catalogue and take site sections and squeezes of the original mouldings.
• Produce fully dimensioned working drawings for approval and construction.
• Produce sketch profiles of each individual moulding.
• Manufacture moulds in GRP, silicone rubber and plaster.
• Cast new sections of fibrous plaster and GRG.
• Install on site new ceilings and features as per original.

OrnateInteriors

Project Type

  • Heritage plastering
  • Plastering

Location

  • Bradford

Value

  • 534k

Supplier

  • CCF

Architect

  • Tim Ronalds Architect