0121 707 0077



  • HOME
  • ABOUT US
    • ABOUT US
    • FIS CAMPAIGNS
    • FIT-OUT FUTURES
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • WORKING GROUPS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • TECHNICAL RESOURCES
    • ORGANISATIONAL CAPABILITY
    • BUILDING SAFETY
    • BUSINESS & LEGAL
    • SUSTAINABILITY
    • HEALTH & SAFETY
    • MENTAL HEALTH
    • DIGITAL CONSTRUCTION
    • ACOUSTIC VERIFICATION SCHEME
    • SUPPORT FOR SPECIFIERS
    • BRITISH STANDARDS
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS
    • MANAGE ACCOUNT
    • AWARDS
    • BRITISH STANDARDS
    • PUBLICATIONS
    • REFER A MEMBER
    • SPONSORSHIP
    • WORKING GROUPS
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY TOOLKIT
    • FIS ACADEMY
    • RECRUITMENT
    • CAREERS HUB
    • JOB BOARD
    • QUALIFYING YOUR WORKFORCE
    • FUNDING YOUR TRAINING
    • TRAINING AWARDS
    • FIND TRAINING
      • TRAINING DIRECTORY
      • CPD
  • SPECFINISH
Join us
Sign in

Avon Street, Bristol

Click to watch video

Click to watch video

Click to watch video

1/5

The Project

V&D Interiors delivered the plastering works at Avon Street, Bristol, a major purpose-built student accommodation development comprising 447 bedrooms across three blocks and extending up to 12 storeys.

The package involved approximately 43,087m² of skim finishes to walls and ceilings, together with approximately 9,867 linear metres of bulkheads and columns, requiring around 5,680 bags of British Gypsum BoardFinish.

A key challenge was achieving and maintaining a consistently high-quality finish across such a substantial volume of repetitive accommodation spread across three separate blocks. Benchmark rooms were established to agree the required standard of finish, providing a quality reference that V&D maintained throughout all three blocks. This approach contributed to low levels of snagging and a consistent finished product across the development.

The scale of the works also created significant labour and logistical demands. The constrained site offered very limited storage and material-handling space, with a main road bounding the site and the River Avon to the rear.

V&D carefully coordinated labour, material movements and the plastering sequence to successfully deliver more than 43,000m² of high-quality skim finishes across three blocks, maintaining the benchmark standard despite the scale and challenging site conditions

Scope of Works

  • Plastering
  • Partitions
  • Wall Linings
  • MF Ceilings
  • LIG Ceilings
  • SFS
  • Beam Encasements
  • Sheathing Board

V&D Interiors

Project Type

  • Plastering (Internal)

Location

  • Bristol

Value

  • £3.915m

Supplier

  • British Gypsum

Architect

  • Chapman Taylor
Arrow Created with Sketch. Back to Gallery