0121 707 0077              info@thefis.org




  • HOME
  • ABOUT US
    • ABOUT US
    • MEET THE FIS BOARD
    • FIS BOARD NOMINATIONS
    • MEET THE SKILLS BOARD
    • MEET THE TEAM
    • MEMBERSHIP VETTING
    • FIS CAMPAIGNS
    • CONTACT US
    • PRIVACY POLICY
  • MEMBER DIRECTORY
  • PROJECT LIBRARY
  • NEWS
  • EVENTS
  • KNOWLEDGE HUB
    • KNOWLEDGE HUB
    • BUILDING SAFETY ACT
    • TECHNICAL RESOURCES
    • BUSINESS SUPPORT
    • HEALTH & SAFETY
    • QUALITY & RISK MANAGEMENT
    • SUSTAINABILITY HUB
    • DIGITAL CONSTRUCTION TOOLKIT
    • SUPPORT FOR SPECIFIERS
    • ACOUSTIC VERIFICATION SCHEME
    • BREXIT TOOLKIT
  • MEMBERSHIP HUB
    • MEMBERSHIP HUB
    • BECOME A MEMBER
    • MEMBER BENEFITS HUB
    • MANAGE ACCOUNT
    • AWARDS
    • WORKING GROUPS
    • PUBLICATIONS
    • SPONSORSHIP
    • REFER A MEMBER
  • SKILLS HUB
    • SKILLS HUB
    • COMPETENCY
    • CAREERS HUB
    • RECRUITMENT & INDUCTION SUPPORT
    • JOB BOARD
    • APPRENTICESHIPS & QUALIFICATIONS
    • SKILLS & TRAINING FUNDING
    • TRAINING AWARDS
    • TRAINING DIRECTORY
    • TRAINING OFFERS
    • CPD
      • CONTINUING PROFESSIONAL DEVELOPMENT (CPD)
  • SPECFINISH
  • MEMBERS LOGIN

Ashton Grove Middle School, Hertfordshire

The Project

Weston Homes were able to design high finish quality to 30 units with constraints on retaining many of the original school fixtures and fittings, including original sark boarding to halls. Original plaster to walls were retained and made good with lime plaster to externals. Unit 3 & 4 was separated by an SFS wall designed to 14m with studs at 300mm centres with blocking details, which was insulated and boarded, particular care taken to installing head track to existing ceilings, Works were carried out with scissor lifts. Partitions to level 1 were installed cutting around the original timbers with every care taken in finishing taping and jointing. Also, we had flats to construct in basement areas which involved tanking and special insulations works, Each unit had different challenges to achieve the high finish required. The library and main hall areas had specific areas maintained, which included existing plaques, swords and mosaic glass to windows
The school was originally founded by philanthropist Frances Ashton in 1728 and became Dunstable Grammar School in 1888 when the grand Victorian building was opened, Ashton Grove pays attention to both the heritage and future potential of the site.

www.timkconstruction.com/

Project Type

  • Heritage plastering

Location

  • Hertfordshire

Value

  • 730K

Sector

  • Education

Architect

  • Weston Homes
Arrow Created with Sketch. Back to Gallery